Following the jointing procedure in this handbook allows for checks to confirm complete insertion. These include the following key points:
- Cut the pipe at one of the pipe graduation marks and the fitting must then Push-Fit to the next mark.
- The EPS Push-Fit Depth Gauge and Deburring Tool makes a feint mark on the tube as an indicator to where the fitting must be inserted.